OPENING A FOOD ESTABLISHMENT
IN GALVESTON COUNTY
 

Submitting Plans

Plans drawn to scale, blueprints or contractor's drawings, for new construction or renovation of an existing structure, must be submitted to the Health District for approval. Plans should show the layout (identifying equipment and providing an equipment list), arrangement and construction material of the entire proposed food service establishment operations, including food preparation, storage and service areas, dining areas and outside garbage storage areas.

Note: Feel free to ask Health District personnel to come out and look at an existing building and/or establishment that you have in mind before you make a purchase or sign a contract to help get a general idea of how much repair work may be needed.

Contact other municipal departments (i.e. plumbing, building, electrical, fire, zoning, etc.) for additional requirements. A Certificate of Occupancy will be required before issuance of a Health Permit (where applicable.)

Once your floor plans have been approved and you have started work on your establishment, feel free to call the Health District to ask questions, get advice or even ask them to come out to see your progress.

NOTE: We suggest that you do not advertise an opening date until after the final inspection has been conducted. Food and beverages shall not be stored on the premises until your establishment has been approved for a Food Service Permit. After the Application for Food Service Permit has been approved and issued to you by the Health District, it must be returned to the Health District with the required fee to purchase your Food Service Permit.

Once you have purchased your Food Service Permit, you may operate your establishment. The Food Service Permit must be posted in a conspicuous place.

   

GUIDELINES FOR FOOD ESTABLISHMENT OPERATORS
 

The following information is presented as a GUIDELINE ONLY to outline the primary requirements for a food establishment in Galveston County. Specific needs should be discussed with Health District Sanitarians.

NOTE:

1. A copy of your menu (a list of all foods and beverages to be served) shall be submitted.

2. A drawing of the floor plan, including the required equipment shall be submitted. ( Floor plan and equipment must be drawn to scale.)

3. A food service plan review must be conducted for the purpose of approving floor plans prior to starting construction and/or remodeling.

4. Each time changes or revisions are made on floor plans after the initial approval, plans must be submitted again for approval.

If additional information is required, please call our office. Thank you for your cooperation.